Coogee Chemicals Chlor-Alkali Expansion Project

  • Client: Coogee Chemicals
  • Location: Kemerton, WA
  • Completion: In Progress
  • Value: $1.5m

Construction of Electrical High Voltage and low voltage systems, instrumentation installation and pre-commissioning of the new Chlor-Alkali project.

Pacific Energy Integrated 34MW Hybrid Thermal Renewables Power Station

  • Client: Pacific Energy
  • Location: Coburn, WA
  • Completion: October 2022
  • Value: $2.8m

8MW high efficiency/low emissions gas generation, 1100kL on-site LNG storage and regasification facility, 4MW battery energy storage system (BESS), and 12MW solar capacity. EEHA Installation and inspection.

Ventia Defence Fuel Transformation Program

  • Client: Ventia
  • Location: Garden Island, WA
  • Completion: September 2022
  • Value: $4.4m

Design, Construct and commission the electrical & Instrument control system, PLC, and site-wide fuel Emergency Stop System installation for the ship refuelling system, including a new purpose-built MCC and HMI, Installation site-wide fibre optic loop.

Harold E. Holt (HEH) Base High Voltage Refurbishment

  • Client: Raytheon Australia
  • Location: Exmouth, WA
  • Completion: January 2022
  • Value: $7.5m

Design, Construct, Supply and install 7 High Voltage kiosks around the Naval Communication Base to replace ageing infrastructure and ensure another 30 years of operation. The HEH Base mission interruptions are measured in seconds per year, so reliability and planning were critical to this project’s success.

Space Surveillance Telescope Central Power Station

  • Client: Sitzler – Defence
  • Location: Exmouth, WA
  • Completion: April 2021
  • Value: $13.5m

As the selected EPC Contractor OFI delivered the Design and Construction, integration and commissioning of all disciplines of this purpose-built 3MW Power Station consisting of 6 Generators, a Switchroom, a Control room, fuel delivery and fuel storage systems.

FMG Cloudbreak Iron Ore Sizing Plants

  • Client: RCR
  • Location: Cloudbreak, WA
  • Completion: February 2017
  • Value: $4-5m

Electrical, Instrument & Control Engineering Design & Construct, High Voltage Distribution, Starters & Power Systems, VSDs, Lightning Protection, PLC & SCADA Automation, Lighting Design, Procurement, Construction, Testing & Commissioning.

Ezion Tiwi Islands Fuel Facility and Port

  • Client: Ezion
  • Location: Tiwi Islands, NT
  • Completion: May 2015
  • Value: $5-6m

Electrical, Instrument & Control Engineering Design and Construct, MCCs, Starters and Power Systems, VSDs, Soft Starters, Lightning Protection, Lighting Design, PLC and SCADA Automation, EEHA Explosive Areas Design, AS1940 DG Compliance, Procurement, Construction, Testing & Commissioning.

Rio Tinto Mesa J Sizing and Stockpiling Plant

  • Client: Rio Tinto Iron Ore
  • Location: Panawonica, WA
  • Completion: February 2015
  • Value: $4m

Electrical, Instrument & Control Engineering Design and Construct, High Voltage Distribution, Starters and Power Systems, VSDs, Soft Starters, Lightning Protection, PLC and SCADA Automation, Lighting Design, Procurement, Construction, Testing & Commissioning.

BHPB Orebody 25 Ore Reclaim Hoppers

  • Client: BHPB Iron Ore
  • Location: Newman, WA
  • Completion: February 2015
  • Value: $2m

Electrical, Instrument & Control Engineering Design and Construct, Cable Reelers, Starters and Power Systems, VSDs, Soft Starters, Lightning Protection, PLC and SCADA Automation, Lighting Design, Procurement, Construction, Testing & Commissioning.

Water Corp Mandurah WWTP Upgrades

  • Client: Water Corporation
  • Location: Mandurah, WA
  • Completion: March 2015
  • Value: $0.6m

Electrical, Instrument & Control Engineering Design and Construct, Switchboard Upgrades, Design and Construct new Switchboards, PLC and SCADA Automation, Utility Integration, Brownfield Integration and Cutover, Lighting Design, Procurement, Construction, Testing & Commissioning.

Bunge Grain Receival, Storage and Export Facility

  • Client: Bunge
  • Location: Bunbury, WA
  • Completion: April 2014
  • Value: $5.4m

Electrical, Instrument & Control Engineering Design, Power Systems, MCCs, Switchboards, Power Factor Correction, VSDs, Soft Starters, Lightning Protection, EEHA Hazardous Area Designs & Protection, CCTV & Lighting Design, Procurement, Construction, Testing & Commissioning.

Cristal Pigments Boiler Upgrade

  • Client: Cristal Pigments
  • Location: Australind, WA
  • Completion: November 2013
  • Value: $1.5m

Electrical HV and LV, Instrument & Control Engineering Design, Power Systems, VSDs, Soft Starters, Lightning Protection, Procurement, Construction, Testing & Commissioning.

Atlas Iron Stage 2 Radial Stackers & Reclaim

  • Client: Atlas Iron
  • Location: Utah Point, WA
  • Completion: July 2013
  • Value: $1.1m

Electrical Design & Construction, Instrumentation & Automation, Earthing & Lightning Protection, Site Testing & Commissioning.

FMG Bulk Diesel Storage Facility & Rail Car Diesel Offloading / Distribution Systems

  • Client: FMG
  • Location: Christmas Creek, WA
  • Completion: May 2013
  • Value: $3m

Engineering, Design & Construction of Electrical Instrument & Control Systems, Complete systems automation from Offloading to Site Distribution, Design of Earthing & Lightning Surge Protection, Lighting & Small Power, Complete Online Hydrocarbon Leak Detection/Monitoring system spanning 30km.

Water Corporation Picton Water Treatment Plant

  • Client: Water Corporation
  • Location: Bunbury, WA
  • Completion: May 2012
  • Value: $4.5m

Electrical Design, Construction, Testing & Commissioning, Including Main Water Treatment, Washwater/Sludge Treatment Process and Chemical Dosing Systems, Procurement, Installation & Commissioning of Instrumentation and Electrical Systems, PLC and SCADA Automation.

Bunbury Port Oil Export Facility & Process Plant Upgrade

  • Client: Wren Oil
  • Location: Bunbury, WA
  • Completion: 2013
  • Value: $1.5m

Engineering, Design & Construction at Port Storage/Export Facility and Picton Oil Refinery, MCC, Main switchboards, VSDs, & Switchroom, PLC and Citect SCADA Automation.

Muja AB Refurbishment Project – Coal Handling Upgrade

  • Client: Synergy
  • Location: Muja, WA
  • Completion: May 2012
  • Value: $2.5m

Electrical Design, Manufacture and Construction for MCCs, PLC Panels,  Field Control Panels, Instrumentation, Automatic Shuttle Controls, PLC and Citect SCADA Automation, Lighting and Small Power.

Cristal Pigment Kemerton Cable Replacement Project

  • Client: Cristal Pigment
  • Location: Kemerton, WA
  • Completion: May 2011
  • Value: $3.5m

Replacement of power & control cables on a Brownfield site, 78km of cable replaced with over 1500 terminations, Site wide fabrication, Provision & installation of new cable ladder networks and associated structures.

POAGS Utah Point Radial Stackers

  • Client: P&O / Port Hedland Port Authority
  • Location: Utah Point, WA
  • Completion: January 2011
  • Value: $1.9m

Electrical Design & Construction of 11 Receival & Stockpiling Stackers & Conveyors, Design and Construction of Electrical Systems, Instrumentation and Automation, Earthing & Lightning Protection, Site Testing and Commissioning.

Iluka Mining Unit

  • Client: Iluka
  • Location: Jacinth Ambrosia, SA
  • Completion: 2010
  • Value: $500,000

Electrical Design, Construction & Commissioning of the Hydraulic Control Systems, Design & procurement of Instrumentation, Re-locatable Unit, 900 Tonnes, 33m Long, 18m Wide and 18m High.

Iluka Mining Units

  • Client: Iluka
  • Location: Murray Basin, VIC
  • Completion: 2009
  • Value: $3.5m

Electrical Design, Manufacture, Construction & Commissioning of the Mining Unit Systems, MCCs, Instrumentation, Hydraulic Track Drive & Positioning Control System. Three track-mounted modules: Apron Feeder, Scrubber & Trommel.

BHPB Bulking in Hoppers

  • Client: BHPB Iron Ore
  • Location: Newman, WA
  • Completion: 2009
  • Value: $700,000

Electrical Engineering, Design, Procurement , Manufacture & Installation for 2x Rail Track Mounted 75kW VSD Driven Apron Feeders, Instrumentation Design and Installation.

Stockton Bore Sites Electrical Installation

  • Client: Synergy
  • Location: Muja, WA
  • Completion: 2010
  • Value: $1m

Engineering, Design, Procurement, Construction and Commissioning,  Electrical installation of 8 x bore sites as an additional water source for Muja power station, Supply & Installation of: Switchboards, Distribution Boards, Field Equipment, Bore Pumps, Miri RTUs & VSD Drives.