OFI recently completed the off-site design and fabrication of a new main switchboard for the WA Plantation Resources (WAPRES) Bunbury Port site.

This was a very complicated project that required the port site to be shut down. OFI worked on:
- PLC Controls
- Switchboard installation; and
- Commissioning of plant back to operational status.
OFI successfully completed the onsite works swiftly and within budget in the shutdown situation. We were able to ensure WAPRES could reactivate ship loading on schedule with minimum downtime.